Identity area
Reference code
SD/Deeds/486.
Title
(A) Application dated 1 July 1910 for extension of time for registration of transfer of patronage of Eglwys Fach, from ...,
Date(s)
- 1910, July. (Creation)
Level of description
File
Extent and medium
Context area
Name of creator
Archival history
Immediate source of acquisition or transfer
Content and structure area
Scope and content
(A) Application dated 1 July 1910 for extension of time for registration of transfer of patronage of Eglwys Fach, from Alfred Canning, and James Smith Wood, of Birmingham, to Thomas Oliver Cross, of Peel Hall, Astley, Lancs., on April 27 1910. (B) Authority for extension. (C) Application for registration of the transfer. (D) Declaration re. details in (c).
Appraisal, destruction and scheduling
Accruals
System of arrangement
Conditions of access and use area
Conditions governing access
Conditions governing reproduction
Language of material
Script of material
Language and script notes
Physical characteristics and technical requirements
Finding aids
Allied materials area
Existence and location of originals
Existence and location of copies
Related units of description
Notes area
Note
Preferred citation: SD/Deeds/486.
Alternative identifier(s)
Virtua system control number
vtls005222720
Project identifier
ISYSARCHB53
Access points
Subject access points
Place access points
Name access points
Genre access points
Description control area
Description identifier
Institution identifier
Llyfrgell Genedlaethol Cymru = The National Library of Wales