File SD/Deeds/496. - (A) 8 March 1915. Application for extension of time for registration of the transfer of the patronage of Llanfigan, Brecs ...,

Identity area

Reference code

SD/Deeds/496.

Title

(A) 8 March 1915. Application for extension of time for registration of the transfer of the patronage of Llanfigan, Brecs ...,

Date(s)

  • 1915, March. (Creation)

Level of description

File

Extent and medium

Context area

Archival history

Immediate source of acquisition or transfer

Content and structure area

Scope and content

(A) 8 March 1915. Application for extension of time for registration of the transfer of the patronage of Llanfigan, Brecs., from William Bowen, of Llangorse, Brecon, to William Powell Price, of Bulwark, Brecon, on 7 Feb. 1906. (B) Declaration in support of (a). (C) 9 March 1915. Bishop's Consent to (a). (D) 10 March 1915. Application for the registration of the transfer noted in (a). (E) Declaration in support of (d).

Appraisal, destruction and scheduling

Accruals

System of arrangement

Conditions of access and use area

Conditions governing access

Conditions governing reproduction

Language of material

Script of material

Language and script notes

Physical characteristics and technical requirements

Finding aids

Allied materials area

Existence and location of originals

Existence and location of copies

Related units of description

Related descriptions

Notes area

Note

Preferred citation: SD/Deeds/496.

Alternative identifier(s)

Virtua system control number

vtls005222730

Project identifier

ISYSARCHB53

Access points

Subject access points

Place access points

Name access points

Genre access points

Description control area

Description identifier

Institution identifier

Llyfrgell Genedlaethol Cymru = The National Library of Wales

Rules and/or conventions used

Status

Level of detail

Dates of creation revision deletion

Language(s)

Script(s)

Sources

Accession area

Related subjects

Related people and organizations

Related genres

Related places

Physical storage

  • Text: SD/Deeds/496.